Home / Building Technology Project Topics And Materials / DESIGN AND IMPLEMENTATION OF WEB-BASED HUMAN RESOURCE MANAGEMENT SYSTEM (A CASE STUDY OF NIGERIA BREWERIES PLC, ABA)

DESIGN AND IMPLEMENTATION OF WEB-BASED HUMAN RESOURCE MANAGEMENT SYSTEM (A CASE STUDY OF NIGERIA BREWERIES PLC, ABA)

Complete Material is ₦3,000 to ₦5,000 | $35 to $ 23 from chapter 1-5 | all in Doc format

Note:Topics with Only Table of content is to Hire a Writer, Delivery Under 48 hrs

DESIGN AND IMPLEMENTATION OF WEB-BASED HUMAN RESOURCE MANAGEMENT SYSTEM
(A CASE STUDY OF NIGERIA BREWERIES PLC, ABA)

TABLE OF CONTENT

Title Page———i

Certification——–ii

Dedication———iii

Acknowledgement——-iv

Abstract ———vi

Table of Content——–vii

Chapter One

1.0 Introduction ——-1

1.1 Statement of Problem——4

1.2 Purpose of the Study——5

1.3 Significance of Study——8

1.4 Limitation——–9

1.5 Scope of Study——-11

Chapter Two

2.0 Review of Related Literature —-12

2.1 The Meaning of Drug Abuse—–13

2.2 The Problem of Drug Abuse—–13

2.3 Disadvantage of Drug Abuse—-14

2.4 Normal Ways of Drug use—–15

2.5 Common Ways of Drug Abuse—-17

2.6 Summary of Literature Review—- 19

Chapter Three

3.0 Research Methodology and Procedure—22

3.1 Population ——–22

3.2 Sample and Sampling Technique—-22

3.3 Validation of the Instrument —-23

3.4 Reliability of the Instrument —–23

3.5 Data Analysis——-23

Chapter Four

4.0 Presentation and Discussion of Result—24

4.1 Analysis and Interpretation of Data—25

4.2 Discussion of Results——38

Chapter Five

5.0 Summary, Conclusion and Recommendation –40

5.1 Summary——–40

5.2 Conclusion——–41

5.3 Recommendation——42

References ———45

Appendix 1——–47

Appendix ———50

 

Hire A Writer NOW

 

 

Download Now

==Click To Pay With Card==

Enter download code you received after making payment to download project:

About Andy Chi

Check Also

PROJECT PLANNING AND PROGRAMMING AS TOOLS FOR EFFECTIVE PROJECT DELIVERY

Complete Material is ₦3,000 to ₦5,000 | $35 to $ 23 from chapter 1-5 | …

THE IMPACT OF INSURANCE POLICIES TO BUILDING PROJECT CONTRACTS (A CASE STUDY OF IMO STATE, OWERRI)

Complete Material is ₦3,000 to ₦5,000 | $35 to $ 23 from chapter 1-5 | …

One comment

  1. Give me your phone number and I’ll buzz you.

Leave a Reply

Your email address will not be published. Required fields are marked *

%d bloggers like this: