Home / Building Technology Project Topics And Materials / SAFTEY MANAGEMENT IN BUILDING CONSTRUCTION SITE A CASE STUDY OF ZEROCK CONSTRUCTION NIGERIA LIMITED, ABA-ABIA STATE.

SAFTEY MANAGEMENT IN BUILDING CONSTRUCTION SITE A CASE STUDY OF ZEROCK CONSTRUCTION NIGERIA LIMITED, ABA-ABIA STATE.

Complete Material is ₦3,000 to ₦5,000 from chapter 1-5 | all in Doc format

Note:Topics with Only Table of content is to Hire a Writer, Delivery Under 3 Days

SAFTEY MANAGEMENT IN BUILDING CONSTRUCTION SITE A CASE STUDY OF ZEROCK CONSTRUCTION NIGERIA LIMITED, ABA-ABIA STATE.

TABLE OF CONTENT

Title Page———i

Certification——–ii

Dedication———iii

Acknowledgement——-iv

Abstract ———vi

Table of Content——–vii

Chapter One

1.0 Introduction ——-1

1.1 Statement of Problem——4

1.2 Purpose of the Study——5

1.3 Significance of Study——8

1.4 Limitation——–9

1.5 Scope of Study——-11

Chapter Two

2.0 Review of Related Literature —-12

2.1 The Meaning of Drug Abuse—–13

2.2 The Problem of Drug Abuse—–13

2.3 Disadvantage of Drug Abuse—-14

2.4 Normal Ways of Drug use—–15

2.5 Common Ways of Drug Abuse—-17

2.6 Summary of Literature Review—- 19

Chapter Three

3.0 Research Methodology and Procedure—22

3.1 Population ——–22

3.2 Sample and Sampling Technique—-22

3.3 Validation of the Instrument —-23

3.4 Reliability of the Instrument —–23

3.5 Data Analysis——-23

Chapter Four

4.0 Presentation and Discussion of Result—24

4.1 Analysis and Interpretation of Data—25

4.2 Discussion of Results——38

Chapter Five

5.0 Summary, Conclusion and Recommendation –40

5.1 Summary——–40

5.2 Conclusion——–41

5.3 Recommendation——42

References ———45

Appendix 1——–47

Appendix ———50

 

Hire A Writer NOW

 

Call +2349038177363 before making payment

Download Now


==PAY WITH CARD NGN 5,000==


==PAY WITH CARD NGN 3,000==

About admin

Project Writers Nigeria, we write research topic, thesis, term paper, proposal, seminar paper with PowerPoint presentation at a cheap price and we used best quality content with 100% free plagiarism. We offer project abstract, chapter one, table of content free for the student in all department ranging from Accounting, business, Law, civil engineering, Education, Economics, Computer Science, mass communication etc..

Check Also

HEALTH AND SAFETY MANAGEMENT IN BUILDING CONSTRUCTION SITE (A CASE STUDY OF IMO STATE)

Complete Material is ₦3,000 to ₦5,000 from chapter 1-5 | all in Doc format Note:Topics …

PROJECT PLANNING AND PROGRAMMING AS TOOLS FOR EFFECTIVE PROJECT DELIVERY

Complete Material is ₦3,000 to ₦5,000 from chapter 1-5 | all in Doc format Note:Topics …

Leave a Reply

Your email address will not be published.

%d bloggers like this: